Projects

Due to the skilled staff and implemented innovative technologies, our services are highly valued by our customers. Hydro Solutions is a company engaged in the construction of hydraulic structures, from consultation to the design and installation of the structures. Our priority is to propose the right and professional solutions to our customers. We implement innovative technologies to achieve the best results and never stop learning, even though most of our employees have at least 10-15 years of work experience. As a result of cooperation with leading companies, for the first time in Armenia, multi-path acoustic flowmeters were installed in large diameter pipelines and tunnels based on international experience and the requirements of CEI IEC 41 standard.

  • Feasibility study of “White Power” SHPP (business plan),
  • “Eri Dzor” SHPP project,
  • Upgrade and reconstruction of “Geghi-2” SHPP,
  • Project of 2 types of observation towers at Ararat gold extraction plant,
  • Preparation of design and estimate documents for the implementation of the modern monitoring system of 3 earth dams of “Conturglobal Hydrocascade” company (in progress),
  • Feasibility study and monitoring of hydraulic equipment of “Rind” SHPP (in progress).

Preparation of design package for installation of measuring, checking and other devices of Arpi Reservoir dam monitoring system

We carried out engineering-geophysical work, studied the filtration processes of Lake Arpi reservoir, identified the effective sites of the piezometric network in the dam body, and installed measuring, checking, and other devices on the Arpi reservoir dam monitoring system.

Preparation of design package for installation of measuring, checking and other devices of Angeghakot Reservoir dam monitoring system

As a result of the cooperation with the leading British-Italian organizations, a study of the actual condition of the dam and projection were carried out. Besides, we participated in the installation and calibration of the devices.

Design and installation of multi-path acoustic flowmeters in large diameter pipelines and tunnels

As a result of cooperation with leading European, American and Russian companies, for the first time in Armenia, multi-path acoustic flow meters were installed, tested, and operated in large diameter pipelines and tunnels based on international experience and the requirements of CEI IEC 41 standard.